First fix is the stage when the pipework and connections needed for the finished room are put in place before final fittings and finishes. The most useful check happens before walls, floors and cabinetry conceal that work. Confirm the layout, access provisions and agreed testing with the contractor, then record what is ready to close and what still needs attention. This checklist supports a handover; it is not a substitute for installation design.

Loyal Plumbers · Updated

Plan your plumbing project

Freeze the fitting positions with real product information

A room plan needs enough detail to locate actual connections. A basin, wall-hung toilet or concealed shower valve may have specific fixing and connection requirements. Provide the selected product information before routes are finalised, and identify any products that remain provisional. A drawing based on a placeholder fitting can require expensive changes later.

Check the relationship with finished wall and floor levels, furniture and maintenance openings. The plumber, builder and relevant installer need the same current layout. Mark any change clearly rather than relying on a conversation remembered differently by separate trades. Ask who approves the change and whether it alters materials, access or the programme.

Confirm supply and waste routes together

A route that works for a water supply may not work for the waste connection serving the same fitting. The drainage design needs to consider the available route and the receiving system. Approved Document H provides drainage guidance for England, but a project needs its own appropriate design rather than a universal rule copied from a checklist.

Review tight spaces before joinery or structural work makes them inaccessible. An island sink, concealed cistern or shower waste can require coordination well beyond the fitting itself. If a proposed route crosses a shared area or requires changes to the existing drainage, settle the access and approval arrangements before installation reaches that point.

Keep maintenance points serviceable

Water Regs UK guidance distinguishes concealed pipework from arrangements that remain readily accessible. It also addresses access to fittings requiring operation or maintenance. Translate that into practical project decisions: identify the valves, serviceable connections and components that will need attention after the room is finished.

Ask to see how each access panel will work with tiling, drawers and appliances in place. A panel shown on a drawing can still be obstructed by later furniture. Record the location of concealed routes so future fixing work can be planned carefully. Photographs help, but should accompany dimensions and a clear description rather than replace them.

Agree a hold point before covering the work

A hold point is a planned pause when the responsible contractor checks that the relevant work is ready for the next trade. It should occur before boarding, screeding or closing an area that needs inspection. Agree who calls the check and who records the outcome so it does not disappear between subcontractors.

Do not assume that the arrival of plasterboard means testing has been completed. Ask what checks apply to the installed services, which areas were included and whether any connection is still temporary. The test method and requirements belong to the installation specification and competent contractor, not a homeowner improvising pressure tests.

Use a clear first-fix handover record

A concise record can prevent disagreements about whether work was complete when it became concealed. Include the drawing version, checked areas, outstanding items and any restrictions affecting the next stage. The record should be understandable to the contractor returning for final connections.

The following checklist keeps design decisions separate from evidence of completion. It also gives the main contractor a way to stop premature closure when something is unresolved.

First-fix handover before concealment
CheckEvidence to retainIf unresolved
Fitting positions and connection requirementsCurrent layout and selected product detailsResolve before final routes are fixed
Isolation and maintenance accessLabelled plan or photographs with locationsRevise access before finishes
Installed supply and waste routesRecord of agreed routes and alterationsConfirm changes with affected trades
Required installation checksContractor’s test or check record and scopeKeep relevant areas accessible
Temporary ends and outstanding connectionsExplicit list for the next visitProtect and identify until completion
Permission to close the workNamed handover decision and dateKeep the hold point open

Coordinate the next trades and temporary use

Agree how installed pipework will be protected while other work continues. The site team needs to know which areas can be drilled, boarded or used for storage, and which services remain incomplete. Keep temporary arrangements clearly identified so an unfinished connection is not mistaken for a usable fitting.

If the property remains occupied, plan the usable toilet, washing facilities and water interruptions at each stage. A first-fix milestone does not mean the new bathroom can be used. Explain to occupants which facilities remain available and who to contact if temporary supplies leak or fail. Avoid unauthorised changes to the contractor’s temporary arrangements.

Plan second fix and final checks at the same time

Confirm which fittings the plumber will return to connect and whether customer-supplied products must be on site by a particular stage. Check that missing valves, wastes or specialist connection kits will not prevent completion. Keep packaging information and instructions where the installer can find them.

Loyal Plumbers handles first-fix pipework and final plumbing connections for London refurbishments. Share the current layout, selected fittings and project sequence when enquiring. We can discuss the pipework scope, access and handover requirements before work is hidden, with the final installation and testing responsibilities agreed as part of the project.

Common questions

Should every joint be photographed?
Agree the record that is useful for the installation. Photographs of routes and important connections can help, but do not replace required checks or prove the quality of a concealed joint.
Can I change the tap after first fix?
Possibly, but confirm compatibility first. A different fitting can require different connection positions, supplies or access, particularly for concealed products.
Who decides the walls can be closed?
Agree this within the project team. The relevant contractor must complete the required checks, and the person coordinating the work should record the handover before concealment.