Skip to content
10 active vans · 24/7 · London & the M25
ResidentialCommon faults
Get in touch
Book an engineer
Maintenance, landlords and reports guides →

What an EICR adds to a home purchase survey

An EICR gives a home buyer information about the condition of the fixed electrical installation within an agreed inspection scope. It answers a different question from a general building survey or an appliance check. Arrange it early enough to review limitations and any further work before committing to a purchase decision.

Loyal Plumbers · Updated

Discuss an EICR enquiry

Find out what your building survey actually includes

Read the survey terms rather than relying on the name of the survey package. A surveyor may comment on visible electrical features and recommend a specialist inspection, without carrying out the electrical testing that supports a condition report. Ask which observations prompted the recommendation: missing records, visible alterations and a specific defect are different starting points.

Give the electrical inspector the relevant extract, with the seller’s permission where required. A vague instruction to check the electrics can leave both parties expecting different outcomes. A useful brief identifies the property being bought, known alterations, outbuildings or other supplies and any concerns already raised. Your conveyancer can separately explain what documents the transaction requires and what questions should be put to the seller.

Request the existing paperwork before booking

Ask for the latest EICR with its schedules, certificates for additions or rewiring and evidence of subsequent remedial work. A front page or estate agent’s description cannot show the full inspection extent. Match the address, date and installation description to the property now offered for sale. A flat’s report should not be assumed to cover shared building equipment.

Look for changes made after the report: a kitchen refit, loft conversion, garden office or replacement consumer unit may alter the picture. Missing paperwork is a reason to investigate the evidence, not proof that every circuit is dangerous. Conversely, a recent certificate for one project does not establish the condition of untouched wiring elsewhere. Ask the inspector which documents will help plan the visit.

Agree access with the seller and occupier

An inspection needs more than keys to the front door. Discuss access to the consumer unit, rooms, relevant accessories and any additional distribution boards. Tell the inspector about locked storage, fitted furniture and areas the seller will not permit to be disturbed. Agree who can authorise access decisions while the visit is taking place.

Testing can interrupt electrical supplies. The occupier should know this in advance and identify equipment or circumstances that need special arrangements. Do not promise that every concealed cable will be exposed or that all areas can be assessed without disruption. Ask how restrictions will be recorded and whether a further visit could be needed. A report with extensive exclusions deserves a different buying discussion from one with broad, well-documented access.

Read the extent and limitations before the headline result

Start with what was inspected, what was tested and what could not be assessed. The purpose is to understand the existing installation at the inspection date; it is not a guarantee of future reliability or a valuation of the home. A satisfactory result does not mean the installation has every feature a buyer might want.

Separate safety observations from desired improvements such as extra sockets, relocated lighting or capacity for planned equipment. Those improvements can still affect your budget, but should not be presented as defects unless the report identifies them that way. Ask for explanations tied to actual locations and observations. This makes it easier to discuss the findings with the seller and compare remedial proposals later.

Check the report version when further investigation appears

The IET explains that BS 7671:2018+A4:2026 changes the treatment of FI: an FI observation alone no longer makes the report unsatisfactory, and further investigation is advised. Earlier forms differ. Ask the inspector to explain the edition used and the action needed; do not dismiss an existing finding because terminology has changed.

For a purchase, the practical question remains whether unresolved information could change the repair scope or your decision. Agree who will arrange the investigation and when the result will be available. If the property is to be let, landlord duties require separate consideration under the applicable rules. A buying checklist is not a substitute for that compliance assessment, and a negotiated sale price does not resolve an electrical safety concern.

Turn findings into an intelligible work proposal

Request a proposal that identifies the observation being addressed, the work included and the evidence that will be supplied afterwards. Ask which items need prompt attention and which are improvements you can plan separately. Avoid a single unexplained figure for making the electrics compliant when the report lists several different issues.

If a quotation assumes lifting floors, moving furniture or redecorating, make those boundaries explicit. A seller may agree to work before completion or the parties may negotiate another arrangement, but that is a transaction decision for them and their advisers. From the technical side, the important point is that the completed work can be matched to the original concern. A payment receipt alone may not explain what was corrected.

Include your intended use of the property

Tell the inspector if you plan to work from home in an outbuilding, alter the kitchen or add substantial electrical equipment. An EICR is not a full design service for a future renovation, but these plans help identify when a separate design assessment is needed. Do not infer spare capacity simply because the existing home functions normally.

A buyer planning a major refurbishment may sensibly coordinate inspection and design advice before committing to finishes. Another buyer may need only to understand immediate safety work and existing condition. Make that distinction in the brief. It prevents a condition report from becoming an unstructured wish list and helps you compare the actual cost and disruption of the options you are considering.

Book around the decision deadline, not the moving day

Provide the postcode, property type, survey concern, available reports and the date by which you need to review the findings. Confirm that the seller has agreed to the inspection and supply interruptions. Documents can be shared by arrangement after the initial enquiry. Leave time for questions or follow-up investigation instead of treating the visit as the last administrative step before exchange.

Loyal Plumbers can discuss an EICR enquiry and the property access required. Ask for the inspection scope in writing and retain the full report with later electrical records. Neither an EICR nor its absence creates a universal mortgage rule: ask your lender and conveyancer about their requirements. The useful outcome is a clear account of known condition, remaining uncertainty and the work relevant to your purchase.

Common questions

Does every mortgage require an EICR?
There is no single requirement that applies to every mortgage transaction. Check the lender’s conditions and your conveyancer’s advice. A specialist inspection may still be useful where the building survey or missing records leaves an important question unanswered.
Does an EICR check the oven and washing machine?
It assesses the fixed installation within its agreed scope. Appliance condition and appliance testing are separate questions. Identify anything you want checked before booking rather than assuming all equipment in the home is included.
Can a recent EICR be used by a buyer?
It can be useful evidence if the full report, scope and subsequent changes are understood. Ask whether later alterations, limitations or unresolved findings justify additional assessment for the current purchase.

Sources and further reading

Need help with this in London?

Emergency repairs, investigations and planned installations across London and inside the M25. Tell us what you need so we can agree the next step.

Discuss your job